US Navy – Engineered Ramp, PSNS, Bremerton, WA

In 2011, EDCO was awarded a contract by the Defense Logistics Agency to engineer and fabricate a ramp for the US Navy to use between a dry dock and an aircraft carrier. The work included engineering shop drawings, material procurement, welding, machining, non destructive testing, test assembly and load testing, coatings, assembly, shipping preparation and load out by sea. The work was completed on schedule, without cost overruns and to the full satisfaction of the customer.

Rendering and Design and Engineering Stage - Completed by EISI Engineers, Seattle, WA
Assembly at EDCO
Load out at EDCO
Navy article and photo of installation on-site
Fabrication in process at EDCO
Testing at EDCO